Prequalification open for 30MW solar plant in Burkina Faso

April 11, 2024

By Mitchell T
Firms are invited to prequalify for the construction of a 30MW photovoltaic solar power plant with 17MWh of battery storage in Matourkou, Burkina Faso.The German Development Bank (KfW) is supporting the project. The prequalification document can be obtained at the address below.The prequalification should be submitted physically by 09h00 (GMT) on