
Zanzibar invites bids for 132kV backbone transmission system
Zanzibar Electricity Corporation is soliciting bids without prequalification for the procurement of plant design, supply and installation on a turnkey basis of 132kV backbone transmission system infrastructure in Unguja Island, Zanzibar.
The project is divided into two lots. Lot 1 covers the 132kV transmission lines and Lot 2 covers the 132/33kV substations. The expected duration of the project for each lot is 24 months.
Bids may be submitted for one or both lots.
The World Bank is funding the project.
Interested parties can obtain further information from 08h00 to 16h00 between Monday and Friday.
Proposals must be physically delivered by 14h00 East African Time on 26 October 2023.
Electronic submissions will not be accepted.
Zanzibar Electricity Corporation,
Head Office, 1st Floor, Room no. 35,
Gulioni, Unguja Island - 71106
Zanzibar, United Republic of Tanzania.
Tel: +255755445838
Email: zesta.procs@zeco.co.tz
The invitation to bid can be viewed here.
Photo: Tanzania map (© Ebastard129 | Dreamstime)